
11 Jun
2012
11 Jun
'12
3:48 p.m.
I have noticed my stunnel log has reached 100MB on an unmanned system. Is there an option to cause the stunnel log to rollover and delete the old log file after a pre-defined period of time? If not, I can try adding it to log.c. Brian